57.8 F
London
HomeLondon Events NewsLondon 2012 GamesSplash of colour for the Olympic Park as striking central bridge is...

Splash of colour for the Olympic Park as striking central bridge is completed

London Forecast

London
broken clouds
57.8 ° F
60.6 °
56 °
75 %
1.9mph
51 %
Thu
57 °
Fri
62 °
Sat
62 °
Sun
64 °
Mon
59 °
USD - United States Dollar
GBP
1.31
EUR
1.10
CAD
0.74
AUD
0.68

Popular London Tours

Popular

Port of London Authority Relaunches Thames Mudlarking Permit Scheme

The Port of London Authority (PLA) has officially reopened...

10 Interesting Facts and Figures about Oxford Street

London is a city full of history, culture, and...

Great London Buildings: The Millennium Bridge

The Millennium Bridge, officially known as the London Millennium...

Why Travelers to London Need to Install WhatsApp

When planning a trip to London, travellers typically focus...

Londinium: 10 Interesting Facts and Figures about Roman London

  Londinium was the Roman name given to the settlement...

The Tube: 10 Interesting Facts about the Circle Line

The Circle Line is one of London’s oldest Tube...

Share

A splash of colour and a striking new piece of architecture for the Olympic Park was unveiled today as the Olympic Delivery Authority (ODA) announced the completion of a key footbridge that features a design inspired by the London 2012 brand colours.

The central park footbridge spans over the River Lea at a focal point between the Olympic Stadium and Aquatics Centre, and features both permanent and temporary elements to integrate Games and legacy use.

A design competition was held in 2007 to select an emerging architectural and engineering practice to create a key piece of architecture in the centre of the Park. Dublin-based Heneghan Peng Architects, with Adams Kara Taylor Engineers, were selected as the winning team and the construction of their winning bridge design has now been completed.

The bridge features two permanent footbridges linked by a central blade-like walkway, creating a ‘Z’ shape clad in mirror-finish stainless steel that spans the River Lea. For Games-time, a multi-coloured temporary deck has been placed between the permanent spans of the bridge to increase the width, allowing it to carry increased spectator numbers. The temporary Games-time bridge deck has been covered with a multi-coloured rubber surface inspired by the London 2012 brand colours.

Construction work is now 90 per cent complete on more than 30 new bridges and underpasses that cross waterways, roads and rivers to create a connected, open and accessible Olympic Park for Games and legacy.

For further information please contact the Olympic Delivery Authority Press Office on +44 (0)203 2012 700 or visit their website at www.london2012.com.

Jonathan Thomas
Author: Jonathan Thomas

Jonathan is a consummate Anglophile who launched Anglotopia.net in 2007 to channel his passion for Britain. Londontopia is its sister publication dedicated to everything London.

Book London Tours Now!